Back
Back

The Powerpack project, a joint venture of Tesla and electricity provider Southern California Edison (SCE), will support grid operation during peak hours and facilitate the integration of renewable energy resources. A Powerpack pod at the Mira Loma site contains 16,000 lithium ion battery cells, providing more than 210 kWh.