Back
Back

A pilot program by BMW and Pacific Gas & Electric claims to have demonstrated that electric vehicles can serve as reliable and flexible energy carriers within smart grids. The pilot involved the testing of 100 vehicles and lasted for over 18 months. The project report is now available for download.